Home Design for 700 square feet

Home Design for 700 square feet. If you are looking for home design idea then this the best article for you. Here is a 2D sketchup home design for a 700 square foot house.

The house is a single-story, rectangular structure with a front porch and a back deck. The front door opens into a small foyer, which leads to the living room on the left and the kitchen on the right. The living room has a fireplace and a large window that lets in plenty of natural light. The kitchen has a breakfast bar, a stove, a refrigerator, and a dishwasher. The dining room is located next to the kitchen. The master bedroom is located at the front of the house, and it has its own private bathroom. The two other bedrooms are located at the back of the house, and they share a bathroom. The laundry room is located in the basement.


Here are the dimensions of the rooms:

Foyer: 10 feet by 10 feet

Living room: 15 feet by 20 feet

Kitchen: 10 feet by 12 feet

Dining room: 10 feet by 10 feet

Master bedroom: 12 feet by 12 feet

Bedroom 1: 10 feet by 10 feet

Bedroom 2: 10 feet by 10 feet

Bathroom 1: 6 feet by 8 feet

Bathroom 2: 5 feet by 8 feet

Laundry room: 8 feet by 10 feet

The total square footage of the house is 700 square feet.


Here is a list of materials that would be needed to build the house:

Lumber

Siding

Roofing

Windows

Doors

Plumbing fixtures

Electrical fixtures

Appliances

Carpeting

Flooring

Paint

The cost of building the house would vary depending on the location of the house, the materials used, and the labor costs. However, a general estimate would be around $150,000 to $200,000.


Here is a timeline for building the house:

The foundation would take about two weeks to pour.

The framing would take about four weeks to complete.

The roofing would take about two weeks to install.

The siding would take about two weeks to install.

The windows and doors would take about two weeks to install.

The plumbing would take about two weeks to install.

The electrical would take about two weeks to install.

The appliances would take about one week to install.

The carpeting and flooring would take about one week to install.

The painting would take about one week to complete.

The total construction time would be about 12 weeks.